At this point, I would like to thank the Polish Ministry of Infrastructure and PKP PLK company for repeatedly delaying the electrification of railway line 203 on the Krzyż — Piła segment. As a result of this kind of good maintenance, during today's closing of the traffic on line 354 near Budzyń, PKP InterCity trains (with electric locomotives) needed to take a (longer) detour through Bydgoszcz, and therefore they did not cause any delays on lines 203 and 351. Thanks to that, I was able to easily catch my 10-minute change, and the whole ordeal only cost me 30 minutes total.
#rail
This https://arxiv.org/abs/2410.00059 has been replaced.
initial toot: https://mastoxiv.page/@arXiv_csCR_…